Liverpool City Council - Hall Lane Strategic Gateway


 

Hall Lane Strategic Gateway

Artists impression of the Hall Lane scheme

Hall Lane Strategic Gateway, now under construction, will provide a much improved traffic route for vehicles entering Liverpool from the east and will take traffic out of the residential areas.

Work is now on site and on programme.  The whole site has been fenced off and all tree clearance works are complete.  Properties fronting Mount Vernon will be demolished w/c February 8th after services are disconnected.  There are some works on site to move services for Transco and the access road to the hospital staff car park has been widened to cater for two-way traffic.

There are no major works on the highway or traffic diversions at this time however there will be major diversions from mid March affecting the highway at Low Hill junction.

Temporary signals will be installed at the Crown Street/Brownlow Hill junction prior to the West Derby Street closure in mid May.  Further consultation will take place before the closure begins.

Click this picture to open a PDF plan of the Hall Lane Strategic Gateway road scheme (PDF [3.8Mb] opens in new window)

Click the image above to download a PDF version of the plan of the Hall Lane scheme.  Please note that the PDF document is quite large (3.8mb), and slower, non-Broadband browsers may be unable to open it successfully.  If this is a problem, you can also download a lower quality version (PDF [345Kb] opens in new window).

Download the Business Case

For easier downloading, we have split the document into chapter parts:

The above are all Adobe PDF documents. If you have problems accessing PDFs you can download a PDF viewer use a PDF conversion tool or find out more about PDF accessibility.